The goal is to meet the needs of goods import and export, domestic transportation for Nghi Son economic zone and industrial zones in the area of Nam Thanh – Bac Nghe, the whole province of Thanh Hoa and surrounding areas.
Total investment capital is 1,626 billion VND.
– Location is in General Port Area 1 – Nghi Son Port, Nghi Son Economic Zone.
Project scale:
Terminal 3: The total length of the berth is 225m, capable of receiving ships up to 50,000 dwt.
Terminal 4: Total length of side route 239.87m, capable of receiving ships with tonnage up to 30,000 dwt
Pier 5: Total length of side route 210m, capable of receiving vessels up to 50,000 dwt to reduce load.